Nokia 18.8 MW Battery Energy Storage System – Grid Compliance Verification for a 110 kV Connection

The Nokia battery energy storage system plays a significant role in enhancing the flexibility of the Finnish power system. With a capacity of 18.8 MW and a connection to the 110 kV network, the project is classified as a Type D energy storage system, requiring comprehensive modelling, testing, and grid compliance verification.

Ampner played a key role in the project by ensuring that the plant models fully met all applicable grid requirements and that the simulation results successfully passed the functional performance assessments.

Both PSS®E and PSCAD models and simulations were used to verify system behaviour under various grid operating conditions. Ampner also supported testing and validation as part of the grid compliance verification process, which is critical for converting a provisional commissioning permit into a final operational approval.

Related Posts

Scroll to Top
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.